logo

Low Cost Aluminum Beam Formwork Beam Scaffolding Beam For Wall And Slab

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Affordable formwork aluminium beams That Your Business Needs

6061 T6 2.807kg/m Aluminum H beam 150-70 drawing. 6061 T6 4.52kg/m Aluminum I beam 185-100 drawing. 6061 T6 6.34kg/m Aluminum I beam 190-100 drawing. 1/6 Professional formwork aluminium beams for building

Aluminum Formwork - BSL

- After the 25 cycles of reusing of our formwork system we will reach the breakeven point of the conventional formwork cost_ - Aluminium formwork supplied by other companies will consist of two panels_ i_e_ standard panel up to the door level and special panels above the door level_ Since there is a joint in the door level| the panels will ___

Formwork and Scaffolding - CHANGSHU SNS FORMWORK SCAFFOLDING

Wall Formwork Trio Pull Push Porps Domino Vario RoundFlex Slab Formwork K-Stage K-Lock Alumimum Beam Aluminum Beam Post Shore Post Shore Scaffolding Universal Parts RingLock CupLock KwikStage Tube&Coupler

Lattice Girder Manufacturer, Aluminium & Steel Scaffold Beam

Secondly` as an OEM scaffolding manufacturer` you can enjoy the lower cost and cheap price for your scaffold lattice girder products- Because we have regular mass production of the lattice beam thus save unit cost is less than small factories- Thirdly` you can find from us all types of lattice girders-

Aluminum Beam Manufacturer, Aluma Stringer Joist

Wellmade is Aluminum Beam Manufacturer In China. You Can Find All Sizes of Aluminum Beams For Your Construction Formwork and Scaffolding. There are Lightweight and Heavy Strength Aluminum Beams In Wellmade. Our Aluma Beams Are Used as Main Beams or Secondary Beams Supporting Your Concrete Slab& Beam Form Work.

BSL Scaffolding Limited, Noida - Manufacturer of Formwork

Since our inception in 2012; we “Bsl Scaffolding Limited_” are actively committed towards manufacturing and supplying the best in class Column Formwork; Slab Support System; Scaffolding system; Formwork Component; Formwork Accessories; etc_ Find extensively usage at construction industry; these systems; components; accessories and other products are highly appreciated due to their rugged ___

Beam Brackets - TMS Formwork and Scaffolding

Laterally and vertically adjustable Beam Brackets are available within TMS product line` Beam Bracket HD is a heavy duty system with adjustable chassis developed for rather heavy and sizeable beams` HT 20 Beam Side Bracket is also a sturdy solution for beams` Prop Type Beam Bracket is for relatively smaller beams` Slab Stop Ends are […]

ALUMA Beam for Slab

Stronger than steel or wood! ALUMA Beam uses special aluminum alloy! heavy top flange! and is versatile for all concrete forming jobs_ See Product Sheet for details_ ALUMA Beam for Slab Formwork

Aluminum Formwork System for Slab and Beam Construction real

Remove beam bottom and bottom formwork within 48hours; Remove load bearing pillars after 12 days; Remove beam bottom bearing pillar after 14 days; Remove cantilever pillar after 28 days; 3~4 days for one floor construction· Raw material made by 6061-T6 aluminum; Recycle use 150~300 times to make low cost · The average weight is 25kg/m2